FanFılms
HomeAvailable NowMovies
FanFılms

Stream what's new, find what's worth watching, and keep track of every film you love.

Discover

  • Trending
  • Top Rated
  • Now Playing
  • Upcoming
  • Available Now
  • Directory (A–Z)
  • All Movies

Genres

  • Action
  • Adventure
  • Animation
  • Comedy
  • Crime
  • Documentary
  • Drama
  • Family
  • All genres →

Account

  • Favorites
  • Contact Us

© 2026 FanFilms. All rights reserved.

Critical Path backdrop
Critical Path poster

Critical Path

“The engineering journey to Starship and beyond.”

10.0(1)202634mEN
Part of the SpaceX Starship Documentary Series

Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Cast

Justin Styer

Justin Styer

Self

Elon Musk

Elon Musk

Self (uncredited)

Tim Southerton

Tim Southerton

Self

Bobby Peden

Bobby Peden

Self

JL

Jenna Lowe

Self

You Might Also Like

Interstellar: Nolan's Odyssey poster

Interstellar: Nolan's Odyssey

7.8•2014

Interstellar: Nolan's Odyssey

Titanic: The Digital Resurrection poster
Graham Kersey

Graham Kersey

Self

Suren Sanai

Suren Sanai

Self

Austin Dunbar

Austin Dunbar

Self

Thomas Burghardt

Thomas Burghardt

Self

Rami Hamati

Rami Hamati

Self

Comments

?

Titanic: The Digital Resurrection

7.8•2025

Titanic: The Digital Resurrection

The Director and the Jedi poster

The Director and the Jedi

7.4•2018

The Director and the Jedi

The Skywalker Legacy poster

The Skywalker Legacy

7.9•2020

The Skywalker Legacy

The Fountainhead poster

The Fountainhead

6.8•1949

The Fountainhead

Battlestar Galactica poster

Battlestar Galactica

6.9•1978

Battlestar Galactica

The Corporation poster

The Corporation

7.6•2003

The Corporation

Mariah Carey's Magical Christmas Special poster

Mariah Carey's Magical Christmas Special

6.2•2020

Mariah Carey's Magical Christmas Special